<?xml version="1.0" encoding="UTF-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <title>DSpace Coleção:</title>
  <link rel="alternate" href="https://hdl.handle.net/20.500.14867/30276" />
  <subtitle />
  <id>https://hdl.handle.net/20.500.14867/30276</id>
  <updated>2026-07-22T07:45:44Z</updated>
  <dc:date>2026-07-22T07:45:44Z</dc:date>
  <entry>
    <title>Mensuração de ativos imobilizados no setor público: uma análise comparativa entre o modelo de custo e o modelo de reavaliação patrimonial</title>
    <link rel="alternate" href="https://hdl.handle.net/20.500.14867/848405" />
    <author>
      <name>Lima, Sérgio de Azevedo</name>
    </author>
    <id>https://hdl.handle.net/20.500.14867/848405</id>
    <updated>2026-05-08T18:22:56Z</updated>
    <published>2026-01-01T00:00:00Z</published>
    <summary type="text">Título: Mensuração de ativos imobilizados no setor público: uma análise comparativa entre o modelo de custo e o modelo de reavaliação patrimonial
Autor(es): Lima, Sérgio de Azevedo
Descrição: O presente trabalho analisa a mensuração de ativos imobilizados no setor público brasileiro, com&#xD;
enfoque na comparação entre o modelo de custo e o modelo de reavaliação patrimonial previsto na&#xD;
NBC TSP 07, caracterizando-se como estudo de caso aplicado à Administração Pública Federal. O&#xD;
objetivo consiste em avaliar a efetividade técnico-contábil do modelo de reavaliação em relação ao&#xD;
modelo de custo, considerando sua viabilidade operacional, econômica e informacional. A&#xD;
metodologia adotada baseia-se em pesquisa bibliográfica, documental e estudo de caso na Marinha&#xD;
do Brasil, com análise qualitativa dos aspectos normativos, técnicos e institucionais. Como técnicas&#xD;
de abordagem, utilizam-se a análise comparativa dos modelos de mensuração e a investigação&#xD;
empírica dos desafios operacionais observados na prática. Os resultados evidenciam que, embora o&#xD;
modelo de reavaliação proporcione maior aderência ao valor justo e atualização patrimonial, sua&#xD;
aplicação apresenta limitações relevantes, tais como elevada subjetividade, dependência de&#xD;
avaliações especializadas, custos operacionais significativos e restrições sistêmicas. Verifica-se&#xD;
ainda que, em ativos de natureza estratégica e sem mercado ativo, a mensuração a valor justo&#xD;
depende de estimativas indiretas, ampliando o risco informacional. Em contrapartida, o modelo de&#xD;
custo demonstra maior estabilidade, verificabilidade, menor custo operacional e maior&#xD;
sustentabilidade administrativa. Conclui-se que, no contexto analisado, o modelo de custo apresenta&#xD;
maior adequação técnico-contábil e operacional, sem prejuízo da aplicabilidade futura do modelo de&#xD;
reavaliação em ambientes com maior maturidade sistêmica e institucional.&#xD;
palavras-chave: contabilidade pública; mensuração de ativos; ativo imobilizado; modelo de custo;&#xD;
reavaliação patrimonial.
Tipo: bachelorThesis</summary>
    <dc:date>2026-01-01T00:00:00Z</dc:date>
  </entry>
  <entry>
    <title>Informações gerenciais oriundas dos métodos de custeio no âmbito das Organizações Militares Prestadoras de Serviços</title>
    <link rel="alternate" href="https://hdl.handle.net/20.500.14867/846451" />
    <author>
      <name>Moreira, Rodrigo Lima da Silva</name>
    </author>
    <id>https://hdl.handle.net/20.500.14867/846451</id>
    <updated>2025-08-28T17:25:55Z</updated>
    <published>2022-01-01T00:00:00Z</published>
    <summary type="text">Título: Informações gerenciais oriundas dos métodos de custeio no âmbito das Organizações Militares Prestadoras de Serviços
Autor(es): Moreira, Rodrigo Lima da Silva
Descrição: O presente artigo tem o propósito de estudar as informações gerenciais que podem ser extraídas dos métodos de custeio no âmbito das Organizações Militares Prestadoras de Serviços. Neste sentido, foram realizadas pesquisas bibliográficas e documentais a fim de identificar informações que pudessem advir da contabilidade de custos para análise da contabilidade gerencial, com posterior apoio à tomada de decisão. Para tal, foram analisados três dos principais métodos de custeio: por absorção, variável e por atividades. A análise permitiu identificar as possíveis informações gerenciais, bem como, mostrou o alinhamento da Marinha do Brasil com o contido na literatura, bem como, a preocupação que a Força demonstra com a mensuração dos custos de suas atividades.
Tipo: bachelorThesis</summary>
    <dc:date>2022-01-01T00:00:00Z</dc:date>
  </entry>
  <entry>
    <title>O modelo orçamentário-financeiro empregado na construção dos navios da Classe Tamandaré: desafios e oportunidades (2016-2019)</title>
    <link rel="alternate" href="https://hdl.handle.net/20.500.14867/845832" />
    <author>
      <name>Silveira Junior, Waldir Francisco das Neves</name>
    </author>
    <id>https://hdl.handle.net/20.500.14867/845832</id>
    <updated>2025-08-28T17:25:55Z</updated>
    <published>2019-01-01T00:00:00Z</published>
    <summary type="text">Título: O modelo orçamentário-financeiro empregado na construção dos navios da Classe Tamandaré: desafios e oportunidades (2016-2019)
Autor(es): Silveira Junior, Waldir Francisco das Neves
Abstract: This paper aims to identify financial-budgetary draft development in Tamandaré ship Class&#xD;
highlighting its features, challenges and opportunities. The field of study was restricted to the&#xD;
financial-budgetary model drawn to enable ships construction since 2016, when the new federal&#xD;
government budget guideline constitutional amendment came out, until 2019, when the&#xD;
agreement between Brazilian Navy and business consortium was set. The ship building&#xD;
background creation and detailed conditions that induced and allowed EMGEPRON&#xD;
participation are introduced. Subsequently, the financial-budgetary draft is presented, and new&#xD;
model’s challenges and opportunities highlighted. Lastly, considerations are done, about new&#xD;
model and prospects for the future of defense acquisition programs. For this case study in lead&#xD;
documentary and bibliography research were made, as well as interviews with the Brazilian&#xD;
navy intendant corps, who work directly with the program. This exploratory study allows to&#xD;
point out that the main challenges of the Tamandaré ship class program are on political&#xD;
bureaucratic order.
Descrição: O objetivo deste artigo é identificar as principais características do novo modelo orçamentário-&#xD;
financeiro para construção dos navios da Classe Tamandaré, ressaltando seus desafios e&#xD;
oportunidades. O campo de estudo foi delimitado ao desenho orçamentário-financeiro&#xD;
arquitetado para viabilizar a obtenção dos meios navais durante o período de 2016, quando foi&#xD;
aprovado o novo regime fiscal do governo federal, até 2019, ocasião da assinatura do contrato&#xD;
pela MB e o consórcio responsável pela fabricação dos navios. São apresentados os&#xD;
antecedentes à criação do programa de construção dos navios e são detalhadas as condições que&#xD;
induziram e permitiram a participação da EMGEPRON. Posteriormente, o modelo&#xD;
orçamentário-financeiro é apresentado e são ressaltados seus principais desafios e&#xD;
oportunidades. Por fim, são apontadas considerações sobre o novo modelo e suas perspectivas&#xD;
para o futuro dos projetos de aquisição em defesa. Para o estudo de caso em lide foram&#xD;
realizadas pesquisas documentais e bibliográficas, bem como entrevistas com oficiais do Corpo&#xD;
de Intendentes da Marinha, que trabalham diretamente com o programa. Este estudo&#xD;
exploratório permite apontar que os principais desafios atuais do Programa navios da classe&#xD;
Tamandaré são de ordem político-burocrática.
Tipo: bachelorThesis</summary>
    <dc:date>2019-01-01T00:00:00Z</dc:date>
  </entry>
  <entry>
    <title>Detalhamento da coleta de dados de custos de operação e apoio dos navios da Marinha</title>
    <link rel="alternate" href="https://hdl.handle.net/20.500.14867/845752" />
    <author>
      <name>Mendes, Ricardo Luís Veloso</name>
    </author>
    <id>https://hdl.handle.net/20.500.14867/845752</id>
    <updated>2025-08-28T17:25:55Z</updated>
    <published>2019-01-01T00:00:00Z</published>
    <summary type="text">Título: Detalhamento da coleta de dados de custos de operação e apoio dos navios da Marinha
Autor(es): Mendes, Ricardo Luís Veloso
Abstract: Naval assets of modern navies are complex systems, bringing together costly&#xD;
technologies. This impacts the operating and support costs of naval assets over their&#xD;
life cycle, which can significantly exceed their acquisition or development stage and&#xD;
requires proper management of limited financial resources to maintain a state-of-the-&#xD;
art Navy. Although life cycle costing (LCC) has been known for over half a century, its&#xD;
practical application is recent and not yet consolidated. Only in 2013, the Brazilian&#xD;
Navy (MB) published its first related proceedings. The purpose of this monograph is to&#xD;
detail the sources of operation and support data collection inherent to the Navy ships.&#xD;
This research involved reviewing documents from the North Atlantic Treaty&#xD;
Organization (NATO), the United States of America, the Ministry of Defense (MD), and&#xD;
the MB itself to assess adherence to the Cost Breakdown Structure (CBS). Interviews&#xD;
were also conducted to learn about the actions in progress in MB, related to CBS, by&#xD;
applying the 5W2H methodology. The results allowed to detail the data collection in&#xD;
accordance with the activities performed in MB and the available computerized&#xD;
systems.
Descrição: Os meios navais das Marinhas modernas são sistemas complexos, reunindo&#xD;
tecnologias de elevado custo. Isto impacta sobre os custos de operação e apoio dos&#xD;
meios navais durante seu ciclo de vida, que podem ultrapassar significativamente o&#xD;
valor de aquisição ou de desenvolvimento desses meios e exige uma adequada&#xD;
gestão dos limitados recursos financeiros para a manutenção de uma esquadra no&#xD;
estado da arte. Embora o controle dos custos de ciclo de vida (CCV) seja conhecido&#xD;
há mais de meio século, sua aplicação prática é recente e ainda não se encontra&#xD;
consolidada. Somente em 2013, foi publicada a primeira norma sobre o assunto no&#xD;
âmbito da Marinha do Brasil (MB). O propósito desta monografia é detalhar as fontes&#xD;
de coleta de dados de operação e apoio inerentes aos navios da MB. Esta pesquisa&#xD;
envolveu a revisão de documentos da Organização do Tratado do Atlântico Norte&#xD;
(OTAN), dos Estados Unidos da América, do Ministério da Defesa (MD) e da própria&#xD;
MB, para avaliar a aderência da Estrutura Analítica de Custos (EAC) da MB aos&#xD;
modelos da OTAN e do MD. Foram ainda realizadas entrevistas para conhecimento&#xD;
das ações em curso na MB, relacionadas à EAC, por meio da aplicação da metologia&#xD;
5W2H. Os resultados permitiram detalhar a coleta de dados à luz das atividades&#xD;
executadas na MB e dos sistemas informatizados disponíveis.
Tipo: bachelorThesis</summary>
    <dc:date>2019-01-01T00:00:00Z</dc:date>
  </entry>
</feed>

